What is the verison of your PI system? It is possible to do that at channel level form communication channel monitoring.
Can you for raja shekar's reply in the below thread?
What is the verison of your PI system? It is possible to do that at channel level form communication channel monitoring.
Can you for raja shekar's reply in the below thread?
Hello,
In our webi report we have chart and a table, is there any way I can autoalign their width? Means when chart shrink then table shrink too depending on the data selection.
Thanks.
Hi all!
I have an issue with the display of a hierarchy in my webi report.
The report have a crosstab who contain the hierarchy in the vertical axis and month in the horizontal axis and obviously a ratio in the body.
I create an input control to filter the month.
The first time the hierarchy work perfect because show the first level of the hierarchy (with the capability to navigate to the 2nd and more levels).
The problem occurs when i filter the report (selecting another month in the input control). The hierarchy expand automatically all the levels..
how i can fix this?, i only need the first level allways (and the option to navigate thru the other levels).
Thx for your help!!
Hi We have upgraded our E-REC to EHP 606. We are getting complains from our external users that when they try to attach resume or any document for external job posting the blue wheel keeps spinning and a blank window just pop up in IE 11. I have also encountered the same issue in IE 11. Is there any SAP notes available for this issue? Thanks Farhana
Open a command prompt and connect to the database and run these SQL statements.
select ACTIVE from SAPSR3.PATCHECK where CHECK_NAME='DDIC_USER_REQ';
update SAPSR3.PATCHECK set ACTIVE=' ' where CHECK_NAME='DDIC_USER_REQ';
commit;
Check the solution I have provided here:
Regards
RB
Hello All,
I have a requirement wherein i need to add the partner details ( Such Prospect ,Employee Responsible name, Address) onto the standard Lead Origin Interactive Report . Any help would be highly appreciated.
Thanks
With Best Regards
Mamatha
Hi Eduoardo,
Thanks for your reply.
Do you know if the Outsourced Manufacturing LOG_MM_OM_1 and Outsourced Manufacturing 2 LOG_MM_OM_2 business functions remove the limitation mentioned in SAP Note 1892301?
Thanks,
Szymon
Hi Ajit Kumar
I like your suggestion. Where can I add the shipping vendor when there is only 1 vendor field in the PO?
Would you be kind enough to show me the details? I would like to set it up in my dev.box?
What condition should I be using? FRA1?
Thanks
Hi Mark,
No problem. Unfortunately figuring out how to use the new functionality is far from easy. I am still stuck on the Offline Queue functionality and cant quite figure out if I have done something wrong or if the new SDK's are just real buggy at the moment. Not quite sure where to ask.....maybe post a question in the ramp-up, or oss note, not to sure how it works.
I also decided to have a look at the Android side of the SDK's which I have previously worked on a fair amount with version 2.2.4. And to my surprise, it looks like they have totally rewritten almost everything. so much that if I had to migrate my app to SMP 3.0 SDK's it would most certainly not be a simple thing. One of the consequences of being an early adopter I guess. It doesn't really surprise me that most companies are delaying adopting this technology until such a time that it stabilizes and people can see that it has matured to an extent that it wont become deprecated a week after adopting it .
Despite my frustration with this, I do think its going in the right direction, however it still has a long way to go. For one, the "Offline Capabilities", although they're better than not having any, they still aren't a full blown solution for all offline scenarios as it is predominantly geared towards simple scenarios, which is fine in terms of a workflow app, but will not really be ideal for anything that requires more complex database capabilities.
In the mean time I'm going to continue to bang my head against my desk until I can get this to work.
Cheers,
Brad
Dear all,
We are planning to upgrade the SAP ERP system Enhancement Package6 in ECC6.0 ERP system.
Source ERP: ECC6.0
Target verions: ECC EHP6
1) Is there any impact of other environments[BI, PI, & Solman] depend on level of applied EHP6 Version in ERP system.?
2) Is there any impact in design of connection with other SAP system like Connecitivity to the SAP solution Manager sytem ,Centralized user management, PI system?
3) Is it necessary to upgrade the (ST/PI, API) in Solution manager ?
Thanks Thiru.
Thanks Raman.
Had some RC-8 errors in quality. Seems like they were corrected later with following TRs.
No documentation has been made regarding this. We are providing this list of 80 TRs in order to the BASIS team to import into Prod.
Is it fine if we get RC-8 and ask them to proceed as per the order? Any issues regarding this? Say there is TR no 52 with RC-8 and corrected TR may be in 53rd position or 60th position, please advice?
What if come are successful and others are not in an RC8?
Please provide helpful programs in the transport in Production?
I have follow the document from the link to create a partner BO and ACL. But I tried some businness user with access restricted for my Work Center, I can see all the data in OWL. Is there any limitation the document not mentioned?
Hi Experts:
I am facing a challenging requirement when create reports in WEBI.
In BW system, we have a hierarchy like below structure (suppose this structure is no timedependent ):
B
|----B1
|-----B11
|-----B111
|-----B12
|-----B121
|----B2
|-----B21
|-----B22
But, in reports, I only want to display 2th level of this hierarchy (B1,B2), and I hope the hierarchy function is not work (only display it).
For example:
Suppose we have below detailed data records in DSO:
Material | Profit Center | Quantity |
---|---|---|
M01 | B11 | 100 |
M01 | B21 | 50 |
M01 | B121 | 100 |
M01 | B22 | 30 |
when reporting, my result should be like this
Profit Center | Quantity |
---|---|
B1 | 200 |
B2 | 70 |
I have 2 solutions as below:
1. Add a extra field in DSO, this fields will be filled value B1 or B2 when ETL process was executed.
2. Create a transparent table stores the relationship bewteen 2th level and his subordinate nodes, then create a user-exit variable in BEx Query.
These 2 above solution can solve my problem, but,I want to know whether BW can solve this problem in a standard way.
Waiting for your reply.
Best Regards.
Yin YuNan.
Hi Export,
May I know if there any similar function related to richTextBox UI element in Web Dynpro ABAP?
Also, any suggestion on saving the richtext into transparent table?
It will save as binary data? or xml format?
I have no idea on implementing this.
Thanks so much
BR - Chris
Hi Ganesh,
Seems like it was not in order. As a part of testing, as and when there were corrections, multiple TRs were followed from dev to qua. Though some are RC8s, then been successful.
Datasources have been moved to R3 prod and also replicated in prod BW by going to component and replicate meta data.
Should we do any other things in addition to activation of these datasources?
Please run report powl_d01 once.
Might be an issue with POWL query cache.
Also after opening the application if the Query is still there then go to the that tab and click on refresh several times.
Hi Prasad,
I have EPM Add-in SP15 and it is not working with that one.So,Do I need to update to next version?
Why capacity utilisation level field showing blank ! ( IT0007 maintained properly) .
Does the employee is a salaried employee, check ESG grouping for CAP.
Hi,
Please check "Cut off Period" txn.KKA0.
Thanks,
Szymon
You can make use of SAPMEINT component to establish connection between ERP and ME through MII. For this you need to configure and deploy SAPMEINT components.
Check below links for configuration
Configuration of Standard SAPMEINT Interfaces - SAP Manufacturing Execution (SAP ME) - SAP Library
Check below document link for more understanding how communication happens from ECC to ME through MEINT
SAP MEINT Overview and data communication between SAP ECC and SAP ME via SAP MEINT
Thanks,
Padma Rao