Hi Anjan Paul,
How can I force the RECN to revert-back to the original values after I logged all the changes?
Hi Anjan Paul,
How can I force the RECN to revert-back to the original values after I logged all the changes?
Hi,
If you have selected the transport option from the menu bar in OB40, then you have to select each transaction key and include it in the request. Instead of it, you can save the entries, then system will prompt the request save it.
Regards,
Mukthar
pattipati devanandini Ervin Szolkepattipati devanandini
can you modify the source code and suggest the navigation via routing .
Hey, anybody has any thoughts concerning this? How to reveal which authorizations I miss?
Please check in PSA and DSO whether the data is matching r not.
if PSA and DSO data is not matching may be you need to change the design of the DSO.
Regards
Phani Chaithanya
Hi Helmut,
This error normally comes when incoming xml root node does not match to your message type name.
Regards,
Praveen.
Hello SAP Gurus,
First a little background:
We installed and configured our Solution Manager. Everything is working fine. Now we want to configure the change request management. To test the automated transport we created two new clients in the same system, everything is on Solution Manager (SMP).
The Landscape look like this:
SMP - Client 001 -> is productive (also the domain controller)
SMP - Client 100 -> is for development
SMP - Client 200 -> is for quality assurance
So we want to configure the STMS so we can transport the changes with a transport request from the client 100 to the client 200. Through that it should be possible to test the change request management and the automatic transportation.
This is how the transport route should look like:
SMP 100 -> SMP 200 -> SMP 001
Can someone please help me configure my system so that the above works. If that is even possible. I already tried a couple of thing I found on SNC.
Thank you in advance for your help.
Regards
B. Reinert
Hi Akshay,
This sounds like an ideal scenario for the Document Service: SAP HANA Cloud Platform
Cheers,
--Vlado
Thank You Mr. Rehman. My problem is solved.
But I have a few questions ,if you know the answer plz let me know -
1)Instead of the above method can we not use the Tcode OMWW & enable the sales view?
2)Can we also use the MMAM tcode to add a sales view to a Raw material? If Yes ,plz tell me how to do that ?
Thanks & Regards
You should have better chances of getting this answered in the SAPUI5 Developer Center.
Hi Experts,
Any one please suggest me how to make customer warranty expire report.
Process:
Notification comes from the customer, then based on service order new equipment has been replaced. during the replacement equipment has been update with the warranty validity.
Now want to trance with a time period how many warranties are going the expire.
Regards,
Amit
Probably worth getting someone in with OO design knowledge (doesn't have to be in ABAP) to check out what solutions you come up with. Even if it costs a bit extra in the short term, in the long term it could be an excellent investment. Perhaps you can get it paid for out of the training budget - "hands-on training".
I learn OO through Java, and then applied what I learned to ABAP Objects. My first few attempts weren't brilliant, but not disastrous either. You should soon pick it up. Two tips:
1. Don't be afraid to refactor when you've gone down the wrong route
2. If you find you have to refactor and it is difficult - that's a sign you've done something wrong, and really need to redesign!
If we use strategy 40 then it does create production order if we run MRP but we don't want system to create process order at the same time we put sales order in system.
MTS - Strategy 40 scenario:
Create sales order
Run MRP, if no stock to confirm sales order system create production order
Our req:
We don't maintain inventory of customer material. So moment we recieve SO, we manufacture and ship to customer, but in our business there frequent chance of selling same material to different customer. So we can't make it to MTO also.
System should create production order at the time of entering SO before running MRP.
thanks, will let you know
Issue has been solved thru ZQEVAC20 - Report to adjust the quality stock between MM and QM.
Regards,
Tanuj Parikh
please help!
yes correct
Hi All,
I have a requirement to install Content Service for SAP ,I have gone through the several documents ,but still I am having some confusion ,that is the reason I am opening this discussion ,Kindly advise your valuable suggestions on this.
We are already having existing ECC system ,need to configure content services for SAP .
Below are my doubts
1) Can we install Content server our existing ECC system box.
2) Where can we download the content server software
3) Installation procedure
Can any one guide me suitable documentation or ideas or steps to achieve this.
Advance Thanks