Quantcast
Channel: SCN: Message List
Viewing all 8798 articles
Browse latest View live

Re: Serial Number with equipment master

$
0
0

Hi,

 

Please move this thread to SAP EAM.

 

Kind Regards,

Mariano


Re: Problem with Powerbuilder MAPI / Mozilla Thunderbird / Tobit David

$
0
0

Hi Jacob,

 

We have an open ticket about MAPI and never heard of this setting. According to SAP, with "them" it all works fine, is what we got so far.

Re: Match and get data from datawindow

$
0
0

I am sorry I misread your request. You are using a dropdownlistbox, not a dropdowndatawindow.

 

The limitations of dropdownlistboxes are that you don't have data and display columns like dropdowndatawindows, so you don't easily know what the user has chosen.  In your solution you need to get the text the user has chosen in the list box and do a Find in the dept datawinddow. OR

 

Replace the ddlb with a datawindow:.

  • Create the datawindow from external data source
  • Use one column with same data type as your instID
  • In design edit, make it a dropdowndatawindow
  • choose the dataobject from dw_installation_dept
  • choose deptid as data column
  • choose name as display column
  • choose autoretrieve
  • width 300% and vscrollbar
  • place a datawindow control where your ddlb was
  • assign the newly created criteria datawindow as dataobject

in script:

          dw_dept.SetTransObjact ( SQLCA)

          dw_dept.Insertrow(0)

in dw_dept itemchanged event

          data argument is the chosen deptid

if you want the chosen deptid from somewhere else remember to accepttext() before GetItemNumber ( 1 , 'deptid)

Re: overlapping of operations

$
0
0

Hello,

 

There are several business reason why you could need to have an overlapping between two operations: for example, the second operation can be started even when the first operation has not been completed.

 

The overlapping is maintained in the routing (CA02). Click twice in the operation and you will find the Overlapping indicator. Flag this indicator and enter the overlap time and ahead quantity.

 

Kind Regards,

Mariano

Re: how to map the business process of LAM in SAP EAM

$
0
0

Hi Sameer

LAM is amn extension of all o fthe previously existing PM/EAM processes. For example, if you have a process called maintenance works management or if you have a process called master data management, these will not be impacted at the process level. The impact will be at the transactional level by which the transactions like orders, measurement document creation will have additional functionality.

There are plenty of documentation and web sites in which you can find lots of details:

Linear Asset Management | Enterprise Asset Management | SAP

Linear Asset Management | SCN

http://help.sap.com/saap/sap_bp/BBLibrary/Documentation/D61_ERP606_BPD_EN_AU.doc

 

Cheers

Savas

Re: VENDOR - XD01 Access tab by object authorization

Re: operations on order

$
0
0

Hello Raju,

 

You can control the sequence of your operations at the Confirmation.

Go to t-code OPK4, and check the options that you have for Operation Sequence.

 

Check of operation sequence in order

Defines whether a system message is to be issued when the operation sequence is not adhered to and if so, which type of message. This key only applies to confirmations at operation level.


Dependencies

To find out whether the operation sequence has been adhered to, the following checks are carried out: Have preceding operations already been confirmed? Does the confirmed yield from the preceding operations exceed the total confirmed quantity of the operation to be confirmed?

 

Note that for planning, the operations are always plan in sequence, except you have overlapping or an alternative sequence.

 

Kind Regards,

Mariano

Re: Negative accrual amount in settled and closed rebate agreement

$
0
0

check the corresponding config of condition type setup within the rebate agreement. is it dependent on sales volume?


Re: How to upgrade patch level SP9 to SP10 in SAP IDM 7.2

$
0
0

Thank you very much Todor

 

Regards,

Jaya

I want to add mastet-detail view header

$
0
0

Hey expert

I want make master-detail view header. I found bunch of resource of Master-detail view but i couldn't find about header part.


This is image for example

 

FLP.png

upper red line part.

 

Please help me

MDG to ERP Using the Same Client

$
0
0

Hi experts,

 

I am facing issue with MDG FI.

When the G/L Account is completed and approved in NWBC MDGF, (the workflow is done without issues), but the data no were replicated from MDG tables in to ECC (fs00).


I did the the activities from this documents but, the issue continues.

SAP How-To Guide for MDG-F ALE Replication from MDG Hub to ERP Using the Same Client

 

Thank you experts.

Re: RFOPENPOSTING_FR - Company code is not defined

$
0
0

Hello again,

We noticed the certain accounts are the cause for the error message. These accounts do not have a customer or vendor account assigned. Is there a solution to this issue?

Re: Benefit enrollment in pa30 not showing health plan

$
0
0

1 - According to your initial Query, your problem has now been resolved since you can now see your Benefit Plans in pa30.  For the benefit of all users, please mention how you were able to solve your initial query and then close this thread.

 

2 - You should create a new query whose subject would be "Benefit Plans not showing in Fiori App", and mention how you configured your app, so that someone familiar with that part of the configuration could notice your thread an help you.

 

Message was edited by: Rémi Corriveau

Re: SAP BPC 10.0 NW : Performance issue

$
0
0

Hi S,

 

First of all, try not to do any other activities on you computer after you started tracing in Fiddler.

Then after you stopped the trace you should see a few records with your user ID. Click on each of them and it will show how long it ran.

 

When you find the longest it will show from where it was sent and to where.

 

Regards,

Gersh

Re: Display Business Partner relationships in Web UI


Re: Word Document used for background on a datawindow

$
0
0

Looking outside the square... and I am not really serious, but in them olde days people had letterhead stationary... The users could pre-print their word document and shove it in the letterhead tray of their printer... That obviously wont work from pdf'ing without rescanning, so

 

inside the square and as Christopher is suggesting: create a background image which the user can change/override and reference it in background in datawindow.

Re: Keydate not returning the correct time dependant master data

Re: BPC 10.1 NW SP 7 full screen is lost when navigating through screens

$
0
0

Hello Rose,


If you are experiencing a behavior of the screen sliding from one side to the other and stopping in the middle of the screen when opening the list of journals then this behavior should be fixed within the BPC 10.1 NW SP08 release.

 

- If you are unable to apply the Support Package 8 at this time then you could review the updates included within this support package to find a note for this specific scenario.

 

Best Regards,

Alex

Re: Acknowledgment of receipt email for vendors

$
0
0

Thank you Jurgen, as I see i our system we already have set this configuraction you told me in your link; how do i get the confirmaction of receipt? this is got in Bussiness WorkPlace?

Re: ERP-Quotation: Only local CRM products chooseable

$
0
0

You may check note 1446253 question 6.

You need to replicate products from ECC to CRM.

Same for BP/customer in actual fact.

 

The most commonly used scenario is to create ERP quotation from Opportunity.

If the product or BP is not replicated to CRM which means, the products and BPs in Opportunity only exist in CRM, then the copy from Opportunity to ERP quotation will fail.
This is the major impact.

 

As a result, you need to replicate the products to CRM though you can now enter the product ID in ERP quotation w/o any problem yet.


Spencer

Viewing all 8798 articles
Browse latest View live




Latest Images