Quantcast
Channel: SCN: Message List
Viewing all 8798 articles
Browse latest View live

Re: Numbering Series

$
0
0

Hi,

 

It is not possible to create such document series. Refer below screen shot:

 

12.PNG

 

Thanks & Regards,

Nagarajan


Re: Hide Items with Cumulative Quantity Zero option Error in Stock Audit Report

Re: SAP Database Studio fail after first start & close

Re: Production Order Query Help !!!

$
0
0

Hi,

 

Are you working above query in crystal report?

 

Thanks & Regards,

Nagarajan

Re: SD Integration test scripts

Dump in JOIN Query

$
0
0

Hello guys, I have a report. in this report I have some queries, if I execute my report with parameters, this does work well, but if I run my report without parameters to filter in query, the report its very slow and I get a Dump. My query where I get the error in code below:

SELECT   d~j_3gbelnri              d~j_3gposnri              d~eqart  " Categoria del Equipo              d~vbeln  " Documento Venta              d~posnr  "Posicion              d~netwr  "Valor Neto              d~waerk  "Moneda              d~zmeng              e~vbeln AS vbeln2 "vbeln de la VBRP              f~knumv              g~fkdat              g~rfbsk             FROM vbap AS d       INNER JOIN vbrp AS e ON e~j_3gbelnri = d~j_3gbelnri       AND e~vgpos = d~posnr       INNER JOIN vbak AS f ON d~vbeln = f~vbeln      INNER JOIN vbrk AS g ON  g~vbeln = e~vbeln      "INNER JOIN t37ok as h ON      INTO TABLE it_alv2       WHERE d~j_3gbelnri IN p_etm.

The dump in image below:

Captura.PNG

Could anyone can help to let me know if this error its for TimeOut or other? please help me or please tell me if you can see any error in my query.

Re: New WIKI available: Dashboard Factory

$
0
0

Hello Barbara,

 

We just upgraded solution manager to SP 12. Presently we are using Wily EM dashboards.

 

What extra is needed in terms of infrastructure / license for dashboard factory ? How can I get more information about this.

 

Thanks,

SB

Re: Add url in Technical Monitoring

$
0
0

For checking portal availability, you should open startPage. From your screenshot it looks like you are trying to add a WebDynpo application ?

 

Thanks,

SB


Re: Erro validação assinatura - Transferência XML 3.10

$
0
0

Ricardo,

 

Sim, pode desativar a validação da assinatura. Como é uma transferência não vejo problema nisso. E no pior dos casos, não querendo desativar tu pode criar um job e passar todas de forma automática. Mas a melhor forma é desativando.

 

Att

Re: CPS transport files

$
0
0

Hi All,

 

Please find attached image to my question above.

 

Image.png

 

Regards,

Ramana

Re: Hi SAP FI/CO GURUS ...... PLEASE GIVE ME INTERVIEW QUESTIONS ON SAP FI/CO

$
0
0

Hi durga,

 

Thank you so much for posting the question and answers and can you please post some more interview questions and answers...

 

 

Thank You

Manoj kumar

Commitment in PO

$
0
0

Hi Readers,

 

1) What is PO commitment?

 

2) How does the FII affect PO commitment?

 

3) How does LIV affect PO commitment?

 

4) How can I view PO commitment history?

 

Appreciate your input.

 

Thanks!

Re: Bill of Material cannot create in SAP Business One 9.0 PL05

$
0
0

Hi Nagarajan,

 

Thank you for your reply. But I checked already has no any FMS/Stored procedure assigned to BOM.

 

Thank,

 

Borey

Re: Dump in JOIN Query

Re: double click in table control

$
0
0

Hi Luis,

Yes, you are correct, F2 is double click. Actual seems you do not need define double click in PF status, directly response '&IC1' function code in user_command form. that`s same ok.

 

regards,

Archer


Multiple Selector

$
0
0

Below is the problem.

using xcelsius multiple selector how to go about it?

user need to switch and mix and match between the filters whichever way they want to.

needs to filter col A, Col B, Col C, Quarters and so on and so forth

 

when selected the below combination only one row at a time should be on the chart

A1,B1,C1, Q1

A1,B3, C2, Q3

A3, B2,C3, Q1

Re: Need clarity on Stock Ageing Report

Re: loop and abap code help

$
0
0

Hi,

 

For getting the tax details

 

Select Query

 

KONP-KNUMH    =  EKKO-KNUMV.

 

Read Statement.

 

Read it_konp with key knumh = wa_ekko-knumv

                                 kopos  = wa_ekpo-ebelp.

 

 

Hope it helpful.

 

Regards,

Venkat.

'Deploy Service' option not available while creating webservice

$
0
0

Hi All,

I am trying to create a web service from FM referring some of the post available on SDN.

At the step , 'Configure Service' I am not getting check box for 'Deploy Service' .

 

Kindly let me know what could be the reason for this .

Webservice.png

Thanks & Regards,

Priyaranjan

Re: Tools issue,return, MRP

$
0
0

Hi Abraham,

 

Can you please explain in detail about the business scenario that you are facing.

 

For further Reference to Production Resource tools please refer to these links mentioned below.

 

Production Resources/Tools (PRT) - Master Recipes (PP-PI-MD) - SAP Library

 

Process Flow:

1. Create a equipment

  • Create an equipment with IE01.
  • When you create the equipment kindly take care in the Equipment category it needs to be P - PRT.
  • Also in the PRT tab now give the required input like usage,Task list type etc.
  • Here in the below there will be a measuring counter , we have to attach this in the later stage.

2. Create Characteristics

  • Use CT04 to create characteristics.
  • Create a numeric Characteristics with description called "USAGE'
  • Also give the Unit of measure as Each / Pieces.

3. Create a Measuring point

  • Use transaction IK01.
  • Here create the measuring point with the equipment which you created earlier.
  • Attach the characteristics usage in the characteristics filed.
  • Also do check the measuring point is also a counter.

4. Attaching Measuring point to equipment/PRT

  • After the measuring point is created, now in the PRT tab as mentioned earlier attach the same in the field.
  • this assignment is very important.

5. Attaching the PRT in the routing.(CA02)( When you are doing this scenario for the first time, do as described below only)

  • In the routing, go to the operation overview, now attach the PRT as equipment.
  • It will ask you to enter the usage value etc.
  • Here assign 1 and uom as EA/PC whatever you have mentioned in the step2
  • Once you have completed the assignment save this routing.

6. Creation of production order(CO01)

  • Now create a production order for the header material
  • In the operation overview, you can now check if the PRT is assigned.
  • Here you kindly check if the PRT has been attached and also check if the measuring point is also available there.
  • Create,Release and save the production order

7. Production Confirmation ( Co11n)

  • Now do the production confirmation for the production order /Operation for which the PRT has been added.

8. Usage Value( IK03)

  • Now in the IK03 you can display the measuring documents that have created.
  • for each production confirmation you will have individual document getting created.

Now you will have the usage value for the PRT. Since the PRT has been created as equipment we can trigger a maintenance plan etc. from here you can do forward integration to PM module.9. PRT in orders.

  • For example if we have one PRT called PRT0001 this can be used in only one order at a time.
  • So to track if we have used in many order or in which all orders this PRT has been used.
  • You can use PRT in order T.code.

10. General

  • Generally in the discrete manufacturing environment we can attach during the Production order creation.

 

Hope this should solve your query.

 

 

Regards,

 

Vibin.V.Joseph

Viewing all 8798 articles
Browse latest View live




Latest Images