Hi,
1) Yes
2) Yes
You can store the values from the Subreport in an array and use the array variable in the 'Calculation formula' on the 'Calculated Member'. I'm assuming you're bringing one value per row of the crosstab?
-Abhilash
Hi,
1) Yes
2) Yes
You can store the values from the Subreport in an array and use the array variable in the 'Calculation formula' on the 'Calculated Member'. I'm assuming you're bringing one value per row of the crosstab?
-Abhilash
Hi,
if you want to stop the loan recovery from the payroll and settle outside the payroll. then go to the employee master data and in payments tab give the month and select 0200 special repayment (external) and give the remaining amount and save the IT 0045.
test the payroll, system will not consider the loan installments.
check these loan configuration and special scenarios for your reference.
HI Ashwin ,
I tried to implement code as above with copy_data_to_ref .
Its giving me syntax error 'ET_ENTITYSET is not type compatible with formal parameter' when I am using with change parameter .
can you let me know the proper syntax for the same ?
Regards
Supriya
Hi Nisha, I am also going to give associate level under HCM, in EHP 6 on 10th october. This is my mail id- bapu12@gmail.com, can i get ur mail id.
Thanks & Regards
Bapu.
but you send only for serial order generate.but this project also already active.
but i cannot find where is buffer
Dear Priya,
Create two wage types like
Suppose Your base pay wage type is 1000
1. Retro wage type 1002
2. basic retro amount 1003
then copy IN42, 43, 44 into (ZN42, 43 , 44)--> insert the wage type like below mentioned
ZN42
1000
ELIMI *
SUBWTD1002
ZN43
1000
ELIMI *
ADDWTD1002
ZN44
1002
ELIMI *
ADDWTE1003
If still do you have any query kindly let us know...!
Ur's Mohan
Hi Jeroen,
There is only 0CALWEEK in the query. I guess I have to use dimension filter which looks more complicated.
Shuang
Dear All,
Shall i get help from you that, I want to take daily material issue report with Material Group. this will help us to give right data to take Daily cost of production.
Hello,
In MII one of my transaction, i have written a block which catch the exception and have few blocks to be executed. My understanding is, if exception occurs, it should skip all subsequent blocks and end the transaction. But i my case, it is throwing exception and proceeding with execution of other blocks. How can i set the transaction to stop executing other blocks after exception occurs?
-Adarsha.K.S
Hello Experts,
Ours is a 5 system SAP BI landscape. Therefore, we have 2 development system(Project & Support), 2 quality system(Project & Support) and 1 production system. The issue that I am facing here is that BASIS does not allow us to move transport request between two development systems. We have to manually re-create all new object create in one development(Project) to another development(Support) and vise versa. This an additional effort for our developers. And in some scenario in BI we have generated keys for an object(e.g. DTP, Queries, Workbooks). If we create it manually in each development system we will have two key for the same object and hence cause object conflict. I was arguing with our BASIS team about why can't they set up a transport connection between two development system so that manual effort and error is eliminated. They said they can not do that.
Can you experts please provide me your valuable inputs on this topic & best practice? So that I can go with some argument and fight with our BASIS team?
Thanks & Regards,
Rajib
Hello Chris,
The default max size is 1MB. If your spool is bigger than this it will be ignored. You can increase this number by adding a Process Server parameter SAP_MaxSpoolSize on your SAP Process Server with a value bigger than 1MB.
Generally speaking I always say: only retrieve the spool file when necessary. You can turn off spool file retrieval on your job using the SHOWSPOOL parameter by setting it to N(o).
Regards Gerben
replenishment strategy is the right place to configure your form.
at some point within PK_KANBANCARD_PRINT SAP tries to get the from name from table tpk01, tpk02, or tpk03 depending on the type of replenishment strategy.
debug to this point and check why no form is found.
There must be something wrong in the configuration of control cycle, replenenishment strategy
but ... are you always asking global questions without any input ??
Have you done changes to the container elements (I assume that you have done some changes to the workflow since you are transporting it to test)?
Could it be possible that you have created container elements referring to some Z-objects (data elements?) that have not been transported to test yet. Or have you changed some properties of some data element that you are referring?
Take also a critical look to all changes (tasks and their containers etc.) that you did for the workflow template, and see if they are referring to something that perhaps is not yet transported to test system.
Regards,
Karri
Hi Naga.
Thank you for your suggestion..
I had already read the SAP note... Unfortunately is not my case.
Thank's
Hello friends,
Please help me with steps on how to create user exit variables on 0CALDAY in the following scenarios.
1. Create new variable -- get default -- low -- first day of previous week , high -- last day of previous week.
2. Based on cal week -- range variable -- derive -- the low as first day of cal week range and high as last day of cal week range.
3. Based on cal month -- range variable -- derive -- the low as first day of cal month range and high as last day of cal month range.
4. Based on cal quarter -- range variable -- derive --the low as first day of low cal quarter range and high as last day of cal quarter range.
Greatly appreciate your help!
-Isaac
Hi,
If you are specifically looking for Function Module then you can use BP_JOBLOG_READ to read the log of the job and based on the output(message number and ID) you can trigger other job.
Regards,
Karthikeya
Hi Biplav,
Could you please let me know how can i see the data in the excel which was created in Data Stage.And the job log at Data Stage stopped at the message :APT_CombinedOperatorController,0: Logging delayed metadata.
Regards,
Rambabu